1 | Eddy/Hope/Benefit
32 | East Providence/Wampanoag/Seekonk Square
33 | Riverside
34 | East Providence/Seekonk Square
40 | Butler/Elmgrove
61x | Tiverton/East Bay Park-n-Ride

Routes 1, 32, 33, 34, 40 and 61x will be on detour beginning Monday, March 25, 2024 through mid-September to accommodate East Side Tunnel construction. The Tunnel will be closed for repairs during that time.

Routes 32, 33, 34, 40 and 61x

Inbound trips will travel regular route to the intersection of Angell and Thayer Streets, continue onto Angell Street through to Steeple Street and then resume regular route. Passengers will utilize the bus stop on Angell Street at Hope Street. 

Outbound trips will travel regular route to North Main Street and the East Side Tunnel, continue up the hill along Waterman Street and then resume regular route. Passengers will utilize the bus stop on Waterman Street at Hope Street.

Route 1

Inbound trips will travel regular route to Thayer Street, left onto Waterman Street, left onto Brook Street, left onto Angell Street, continue onto Angell Street through to Steeple Street and then resume regular route toward downtown Providence.

Outbound trips will travel regular route to North Main Street and the East Side Tunnel, continue up the hill along Waterman Street, turn left onto Brook Street and then resume regular route.

Routes affected

Share via
Copy link
Powered by Social Snap