Get Directions

1 | Eddy/Hope/Benefit

Eddy Street Bridge Construction Detour

UPDATE: Due to inclement weather, construction has been postponed to Friday, May 16, 2025 at 8 PM.

Route 1 Southbound will be on detour starting on Friday, May 16, 2025 at 8 PM. This detour will last until Fall 2028.

Southbound trips will travel the regular route to Eddy St. and Thurbers Ave., turn left onto Thurbers Ave., right onto Allens Ave., right onto Ernest St., left onto Eddy St. and resume the regular route.

These Southbound bus stops will not be in service as a result:

  • Eddy & Thurbers (Before Applegate) – Stop ID: 12500
  • Eddy After Pavilion – Stop ID: 12385

Northbound trips will remain on the regular route.

Routes affected

Multiple Routes:
3 | Oakland Beach
4 | Warwick Neck
51 | Charles St/Twin River/CCRI
54 | Lincoln/Woonsocket
58 | Mineral Spring/North Providence
66 | URI / CCRI Warwick / Providence
72 | Weeden/Central Falls
R-Line | Broad/North Main

Routes 3, 4, 51, 54, 58, 66, 72, and the R-Line will be on detour on Tuesday, May 13, 2025 from 7 AM to 3:30 PM due to construction at Park Row West in front of the Providence Amtrak Station. This bus stop will not be in service during this time:

  • Providence Station (Park Row W Before Exchange) – Stop ID: 72015

For Inbound service from the train station, please board at the temporary stop at 100 Exchange St. (after Stillman St. and before the Exchange St. Bridge).

Routes 3, 4, and 66 Northbound will terminate at Exchange St. at this stop near the station:

  • Providence Station (Exchange before Park Row W) – Stop ID: 72010

Routes affected

50 | Douglas Ave/Bryant University

North Providence Memorial Day Parade – Monday, May 26

Route 50 will be detoured from 11am to 3pm to accommodate the North Providence Memorial Day Parade.

Inbound trips will travel regular route to Douglas Pike and Twin River Road, left onto Twin River Road, right onto the Rte. 146 South onramp, right at the Mineral Spring Exit, right onto Mineral Spring Ave., left onto Douglas Ave. and then resume regular route.

Outbound trips will travel regular route to the intersection of Douglas and Mineral Spring Avenues, right onto Mineral Spring Ave., left onto Charles St., right onto Rte. 146 North, right at the Twin River Road Exit, left onto Twin River Road, right onto Douglas Pike and then resume regular route.

Routes affected

58 | Mineral Spring/North Providence

West River Street Bridge Paving Project Detour

Route 58 will be on detour on:

  • Friday, May 9, 2025 from 6 AM to 3 PM
  • Monday, May 12, 2025 from 6 AM to 3 PM

Outbound trips will travel the regular route to Charles St., continue to West River St., turn right onto West River St., continue to Corliss St., turn left onto Barbara Leonard Way, turn left onto North Main St., turn left onto Branch Ave. and resume the regular route.

Inbound trips will travel the regular route to Branch Ave., continue to North Main St., turn right onto North Main St., turn right onto Barbara Leonard Way, turn right onto Corliss St., continue to West River St., turn left onto Charles St. and resume the regular route.

Route 58 will be on the regular route on May 10 and 11.

Routes affected

66 | URI / CCRI Warwick / Providence

Route 66 will be on detour starting on Friday, May 2, 2025 until further notice. The I-95 North on-ramp from East Ave. will be closed to traffic. After stopping at URI Knight Campus, Inbound trips will continue on East Ave. to Main Ave., continue on Main Ave. to Post Rd., turn left onto Post Rd., continue to T.F. Green Airport and then resume the regular route. Outbound is on the regular route.

Routes affected

  • High-Frequency
  • Express Route
  • Rapid Bus Route
  • Flex Zone
  • Local Route
  • Special Service
  • Multiple Routes
  • Rapid Bus Route
  • High-Frequency Route
  • Local Route
  • Express Route
  • Flex Zone
  • Special Service
  • Multiple Routes

Say Hello to Wave!

A Whole New Way to Ride with RIPTA!